Construction Tribune

Insights into Structural Engineering 


PART VII: MAINTENANCE OF BUILDINGS—DIFFERENT ASPECTS OF ITS MANAGEMENT

MAINTENANCE OF BUILDING FABRIC — REPAIR AND REHABILITATION The discussion in this part of the article is in continuation with that of the last part under the subhead of Remedial measures for non-structural distresses/damages. Repairing of Chaja——As discussed under the head of identification of defects, the chaja develops flexural cracks, transverse cracks (Figure 10(a)) and…

PART VI: MAINTENANCE OF BUILDINGS – DIFFERENT ASPECTS OF ITS MANAGEMENT

MAINTENANCE OF BUILDING FABRIC – REPAIR AND REHABILITATION The discussion in this part of the article is in continuation with that of Part V. Type of strategy/method (PHASE II(b) in Figure 2): After the distresses/damages under both the categories, i.e. structural and non-structural have been duly identified (as discussed in the earlier parts of this…

PART V: MAINTENANCE OF BUILDINGS—DIFFERENT ASPECTS OF ITS MANAGEMENT

MAINTENANCE OF BUILDING FABRIC — REPAIR AND REHABILITATION The discussion in this part of the article is in continuation with that of Part IV. Ground floor having no basement floor—–As already stated earlier,the ground floor slab constitutes a component of the building envelope. In most of the buildings, the floor-slab is of the cross section…